| ITEM | UNIT | COST | CLASS |
| MILLWORK/CASEWORK | |||||||
| Standard Plastic Laminate Base Cabinet |
L.F. | $220/275 | A | ||||
| Standard Plastic Laminate Upper Cabinet |
L.F. | $130/190 | A | ||||
| Top Only |
L.F. | $80/100 | A | ||||
| Waterproof membrane(add) |
S.F. | $3/7 | A | ||||
| Hardwood Veneer with Stain Finish (add) |
L.F. | 65% | A | ||||
| Storage Shelving, 12' deep plastic laminate (5) each |
L.F. | $90/110 | A | ||||
| Reception Desk |
L.F. | $700/900 | A | ||||
| Wood Base - Paint Grade |
L.F. | $10/13 | A | ||||
| Wood Base - Stain Grade |
L.F. | $16/19 | A | ||||
| Wood Cap - Paint Grade |
L.F. | $20/24 | A | ||||
| Wood Cap - Stain Grade |
L.F. | $26/30 | A | ||||
| DOORS, FRAMES AND HARDWARE | |||||||
| Standard Entry Door: 3' x 9' prefinished oak door in alum. frame with mortise hardware. |
EA. | $900/1,000 | A | ||||
| Standard Entry Door: 3' x 7' B-3 door in alum. frame with "D" series hardware with lockset 20M with closer. |
EA. | $770 | B | ||||
| Standard Interior Door: 3' x 9' paint grade door in alum. Frame with mortise hardware. |
EA. | $725 | A | ||||
| Change door from anodized alum. frame to 3 piece hollow metal (added costs) passage |
EA. | $0/10 | A | ||||
| Standard Interior Door: 3' x 7' B-3 door in alum. frame with "D" series hardware with passage. |
EA. | $615 | B | ||||
| Double Entry Doors |
PR. | $1,650 | A | ||||
| Double Entry Doors |
PR. | $1,300 | B | ||||
| Double Interior Doors |
PR. | $1,400 | A | ||||
| Double Interior Doors |
PR. | $1,050 | B | ||||
| Change door from paint grade to plain sliced oak (added costs) |
EA. | $40/70 | A | ||||
| Change door from paint grade to plastic laminate (added costs) |
EA. | $40/60 | A | ||||
| Change door from paint grade to premium grade mahogany/walnut/cherry (added costs) |
EA. | $100/250 | A | ||||
| Change from anodized aluminum frame to 3 piece hollow metal (added costs) |
EA. | $0/10 | A | ||||
| Change from anodized alum. frame to custom color alum. (added costs) |
EA. | $40 | A | ||||
| Change from anodized alum. frame to one piece hollow metal (added costs) |
EA. | $100/150 | A | ||||
| Door Closer (add) |
EA. | $110 | A | ||||
| Vision Light (add) |
EA. | $80/130 | A | ||||
| Provide lock set in lieu of latch set |
EA. | $60/80 | A | ||||
| Substitute cylindrical hardware in lieu of mortise |
EA. | $40/50 | A | ||||
| Substitute 7' door in lieu of 9' |
EA. | $50/90 | A | ||||
| Kick Plate (add) |
EA. | $40/80 | A | ||||
| Dutch Door with standard interior specs |
EA. | $980 | A | ||||
| 60 or 90 minute rated hollow metal assembly 3' by 8' sound door |
EA. | $1,100/1,500 | A | ||||
| 50 STC 3' x 8' Sound Door |
EA. | $2,200/2,600 | A | ||||
| PARTITIONS | |||||||
| 3-5/8 25 ga metal stud @ 24” center with 5/8 9' - A" |
L.F. | $46 | A | ||||
| 3-5/8 25 ga metal stud @ 24” center with 5/8 10'-"A" |
L.F. | $50 | A | ||||
| 3-5/8 25 ga metal stud @ 24” center with 5/8 12'-"A" |
L.F. | $59 | A | ||||
| If less than 50 l.f. use $100 per l.f. |
|||||||
| Add for slotted track for 9' and 10' high |
L.F. | $4.50 & $4.50 | A | ||||
| Deduct for textured finish for 9' and 10' high |
L.F. | $1.35 & $1.50 | A | ||||
| Deduct for fire tape finish for 9' and 10' high |
L.F. | $2.70 & $3.00 | B | ||||
| Add for R-11 Insulation for 9' and 10' high |
L.F. | $6.30 & $7.00 | A | ||||
| Add for 2 hour rating for 9' and 10' high |
L.F. | $25 & $27 | A | ||||
| Deduct for gypboard one side only for 9' and 10' |
L.F. | $10 & $12 | A | ||||
| Typical column furring for 9' and 10' high |
L.F. | $375 & $450 | A | ||||
| CERAMIC TILE | |||||||
| Walls-Thinset 4 x 4 |
S.F. | $8/10 | A | ||||
| Floors-Thinset 2 x s |
S.F. | $12/14 | A | ||||
| Motar Installation (add) |
S.F. | $6/8 | A | ||||
| Add for waterproof membrane |
S.F. | $3/5 | A | ||||
| Tile Thinset 8 x 8/12 x12 |
S.F. | $10/14 | A | ||||
| Marble Granite Floors 12 x 12 (Thinset) |
S.F. | $16/20 | A | ||||
| CEILINGS | |||||||
| Finished drywall ceiling - Non rated |
S.F. | $5.40 | A | ||||
| 1' x 1' Concealed Spline |
S.F. | $3.75/5.75 | A | ||||
| 2' x 2' Upgraded Grid and Tile |
S.F. | $2.50/3.75 | A | ||||
| 2' x 4' Standard Grid and Tile |
S.F. | $1.75/2.50 | B | ||||
| FLOORING | |||||||
| VCT Standard |
S.F. | $1.50/2.50 | A | ||||
| Sheet Vinyl |
S.F. | $4.25/7 | A | ||||
| Vinyl Base |
L.F. | $1.15/1.50 | A | ||||
| Carpet/Vinyl - Glue Down (S.F. ÷ 9 x 1.1= S.Y.) |
S.Y. | $15/65 | A | ||||
| Carpet /Olefin- Glue Down (S.F. ÷ 9 x 1.1 = S.Y.) |
S.Y. | $10/14 | B | ||||
| Carpet Pad (Standard Commercial)(add) |
S.Y. | $3.50/5.00 | A | ||||
| Hardwood Floor (engineered prefinished) |
S.F. | $11/16 | A | ||||
| Access Floor |
S.F. | $10/14 | A | ||||
| Laminate Floors |
S.F. | $6.50/8.00 | A | ||||
| Solid Hardwood Floors 3/4" |
S.F. | $12/20 | A | ||||
| PAINT | |||||||
| 2 Coats (latex on drywall) |
S.F. | $.35/.43 | A | ||||
| 2 Coats (latex on drywall) |
S.F. | $.33/.36 | B | ||||
| Doors |
EA. | $50/75 | A | ||||
| Door Frames |
EA. | $50/65 | A | ||||
| Millwork (base, molding, etc.) |
L.F. | $2/4 | A | ||||
| WALLCOVERING | |||||||
| Vinyl |
S.F. | $2/3 | A | ||||
| Fabric |
S.F. | $3 and Up | A | ||||
| Acoustic Panels |
S.F. | $12/18 | A | ||||
| SPECIALITIES | |||||||
| Horizontal Mini Blinds |
S.F. | $3.50/4.50 | A | ||||
| Electric Projection Screens (84 |
EA. | $2,100 | A | ||||
| PLUMBING | |||||||
| Sink without other fixtures |
EA. | $2,500 | A | ||||
| Dishwasher (connection only) |
EA. | $125 | A | ||||
| Garbage Disposal |
EA. | $125 | A | ||||
| Instant Hot |
EA. | $300 | A | ||||
| Ice Maker or Coffee Water - Same wall as sink |
EA. | $150 | A | ||||
| Ice Maker or Coffee Water - Away from sink wall |
EA. | $300 | A | ||||
| Water Filter |
EA. | $350 | A | ||||
| Reverse Osmosis |
EA. | $900 | A | ||||
| Basic Beginning Core (Sink, Water Closet) |
EA. | $5,500/7,000 | A | ||||
| Sink (add on fixture to core) |
EA. | $1,300 | A | ||||
| Lavatory (add on fixture to core) |
EA. | $1,300 | A | ||||
| Water Closet (add on fixture to core) |
EA. | $1,500 | A | ||||
| Urinal (add on fixture to core) |
EA. | $1,400 | A | ||||
| Shower - ADA Fiberglass (add on fixture to core) |
EA. | $3,200 | A | ||||
| Drinking Fountain (add on fixture to core) |
EA. | $1,900/3,500 | A | ||||
| Mop Sink (add on fixture to core) |
EA. | $1,300 | A | ||||
| Floor Drain (add on fixture to core) |
EA. | $600 | A | ||||
| Trap Primer |
EA. | $200 | A | ||||
| Electric Water Heater - 6 gallon |
EA. | $775 | A | ||||
| Electric Water Heater - 10 gallon |
EA. | $775 | A | ||||
| Electric Water Heater - 50 gallon |
EA. | $1,200 | A | ||||
| Water Heater-Smitty Pan (with drain) |
EA. | $100 | A | ||||
| Water Heater - Indirect waste for T&P drain |
EA. | $400 | A | ||||
| Water Heater Stand |
EA. | $100 | A | ||||
| Condensate Hook Ups Max - (40'-0) |
EA. | $700 | A | ||||
| Concrete Cut and Patch (for waste in concrete for waste line ) |
S.F. | $36 | A | ||||
| FIRE-PROTECTION | |||||||
| Fire sprinkler semi-recessed fire sprinkler heads |
S.F. | $165/185 | A | ||||
| Concealed Flush Head (add) |
EA. | $175/195 | A | ||||
| Upright head at full height walls |
EA. | $145/155 | A | ||||
| Design/permit costs (add to the other fire-protection items) |
$930/1,250 | ||||||
| Labor (Time and Materials Cost) |
HR. | $85 | A | ||||
| HVAC (Assume base systems installed) | |||||||
| Cooling Only |
EA. | $1,400/1,600 | A | ||||
| Heating and Cooling VAV |
EA. | $2,200/2,300 | A | ||||
| HVAC (Area ÷ 375 = Tons) |
TON | $2,800/3,300 | A | ||||
| Supply Air Register/Associated Ductwork |
EA. | $250/350 | A | ||||
| Return Air Grilles (Plenum Return) |
EA. | $75/95 | A | ||||
| Exhaust Fan |
EA. | $1,200/1,500 | A | ||||
| Ducted Return Grille |
EA. | $250/350 | A | ||||
| ELECTRICAL (Assume base systems installed) | |||||||
| Lighting |
|||||||
| 2' x 4' Parabolic |
EA. | $220/250 | B | ||||
| 2' x 4' Acrylic Lens |
EA. | $180/210 | A | ||||
| Down Light/Wall Washer |
EA. | $340 | A | ||||
| Exit Light/Exit Light w/edge-lit |
EA. | $200/410 | A | ||||
| Double Switch |
EA. | $130/150 | A | ||||
| 3-Way Switch |
EA. | $210 | A | ||||
| Dimmer Switch |
EA. | $190/220 | A | ||||
| Duplex Wall Receptacle |
EA. | $95/115 | A | ||||
| Four-Plex Wall Receptacle |
EA. | $140/160 | A | ||||
| Dedicated Wall Receptacle |
EA. | $200/220 | A | ||||
| Phone/Data Ring & Pull-string |
EA. | $40/50 | A | ||||
| Electrical Hookup for Drinking Fountain |
EA. | $200 | A | ||||
| Electrical Work Required for Water Line for Coffee Machine or Refrigerator |
EA. | $225 | A | ||||
| Electrical Work Required for Exhaust Fan |
EA. | $350 | A | ||||
| GLASS AND GLAZING | |||||||
| Interior windows: |
|||||||
| 1/4 in. clear tempered in alum. frame |
S.F. | $15/20 | A | ||||
| 3/8 in. clear tempered buttglazed installation |
S.F. | $18/30 | A | ||||
| 20 min. rated wire glass in HM frame |
S.F. | $22/30 | A | ||||
| Door Sidelight - 1' X 9' alum. frame |
EA. | $375/425 | A | ||||
| Herculite door - 3' X 9' |
EA. | $2,400/2,800 | A | ||||
| Herculite Double Doors 3' X 9' |
PR. | $4,800/5,500 | A | ||||
| Aluminum/glass storefront door: |
|||||||
| single 3' X 7' |
EA. | $1,000/1,400 | B | ||||
| pair 3' X 7' |
EA. | $1,800/2,500 | B | ||||
| The foregoing information is to be used only as a general reference guide. Please refer to the appropriate trade subcontractor for completeness, accuracy and workload. | |||||||